Please help me to redefine tool change sequence using g-post.
My machine needs tool change sequence as follows.
T1M12 (load T1 from spindel to tool changer assembly )
T2M18 (load T2 to spindel )
M15
I can manage with t2m18 and m15, but I can not get a tool number to load from spindel to tool changer from the CL-data.
Excuse my poor English